Power Business POCSample data

Know your power before it becomes an operating problem.

A concept dashboard for Nigerian businesses to anticipate outage risk, prepare backup power, and understand what unreliable electricity is costing them.

Monitored location

Supermarket
Lagos · Lekki Feeder 3 · Band A

Grid status

Available

Sample premises monitor is online.

Outage risk · 4 hrs

72%

Elevated

Forecast estimate, not a guarantee.

Likely outage window

2:00–5:00 PM

Based on synthetic historical patterns.

Avg outage duration

2.4 hrs

Past 30 days · sample events.

Daily grid availability

17.5 hrs

Observed average in demo data.

Today

24-hour power timeline

Observed gridOutageForecast
12 AM6 AM12 PM6 PM12 AM

Forecast confidence: 78%

Confidence and outage risk are intentionally separate. A high-risk forecast can still have low confidence when data coverage is weak.

Actionable alerts

What should the team do?

Backup readiness

Check generator fuel and cold-storage backup before 2:00 PM.

Planned maintenance watch

No confirmed utility notice in the sample feed.

Restoration pattern

Recent sample outages restore within 1.5–3 hours.

Reliability

7-day grid availability

16.2
Mon
18.5
Tue
17.1
Wed
19.3
Thu
18
Fri
15.6
Sat
17.5
Sun

Pattern

Outage frequency by hour

Darker cells represent more sample outage events.

12a3a6a9a12p3p6p9p
M
T
W
T
F
S
S

Energy mix

Power source mix

24 hrs
sample
Grid 68%
Generator 24%
Solar / inverter 8%

Audit trail

Recent power events

DateStartEndDurationCauseSourceStatus
Sep 304:12 PM7:05 PM2h 53mFeeder faultPremises monitorRestored
Sep 281:18 PM4:02 PM2h 44mUnplanned outagePremises monitorRestored
Sep 256:09 PM7:37 PM1h 28mVoltage issueManual reviewRestored
Sep 233:22 PM6:11 PM2h 49mUnknownPremises monitorRestored
Sep 2011:06 AM1:15 PM2h 09mFeeder faultCommunity + monitorRestored

Business impact

What unreliable power costs

Generator runtime avoided

12.3 hrs

Estimated fuel cost avoided

₦48,000

Cold-storage risk events

1

Operations disruption

37 min

All figures are illustrative POC values. Real cost claims require customer-specific fuel, generator, downtime, and monitoring inputs.

Demo controls

Change the operational state

These controls exist only for customer and investor demonstrations. They do not call a live monitoring or forecasting service.

Illustrative mock data for concept validation only. Forecasts, alerts, feeder names, business metrics, and outage events on this page are synthetic.