Evidence
What is verified?
National source-backed access-to-electricity records from Data Civic.
Power evidence layer
This page keeps the verified national electricity record visible and traceable. The operator-facing product lives one layer above it: location reliability, outage risk, backup readiness, and operating cost.
Designed for shops, pharmacies, clinics, schools, hotels, workshops, estates, and other local operators that need to keep working through unreliable supply.
Open Power for OperatorsEvidence
National source-backed access-to-electricity records from Data Civic.
Reliability
Supply hours, outage frequency, restoration patterns, and location-specific operating history.
Forecast
Higher-risk windows only after the location has enough traceable observations to justify the signal.
Operator action
Translate risk into generator readiness, stock protection, staffing changes, and estimated continuity cost.
Open operator productAccess to electricity (% of population)
202361.2 %
Up 0.7 percentage points since 2022.
Source
World Bank Open Data
Current verified scope: national electricity-access data. It does not describe local supply reliability.
View source dataTrend
Verified national series · Unit: % of population
Latest
61.2 %
2023
Latest verified observation: 2023 from World Bank Open Data.
34 total rows
| Year | Geography | Value | Indicator code | Source |
|---|---|---|---|---|
| 2023 | Nigeria | 61.2 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2022 | Nigeria | 60.5 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2021 | Nigeria | 59.5 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2020 | Nigeria | 55.4 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2019 | Nigeria | 55.4 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2018 | Nigeria | 56.5 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2017 | Nigeria | 54.4 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2016 | Nigeria | 59.3 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2015 | Nigeria | 52.5 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2014 | Nigeria | 54.2 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2013 | Nigeria | 55.6 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2012 | Nigeria | 53 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2011 | Nigeria | 55.9 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2010 | Nigeria | 48 % | EG.ELC.ACCS.ZS | World Bank Open Data |
| 2009 | Nigeria | 50 % | EG.ELC.ACCS.ZS | World Bank Open Data |
Design principle
Utilities and government agencies may eventually use or contribute data, but the current product is optimized for the smaller operator who needs to decide what to do before a disruption becomes expensive.